Latest news from Heavy Lift & Project Forwarding International Magazine

Pasquinelli Ennio steps on the gas

Pasquinelli Ennio has handled the movement of a 195-ton (176.9-tonne) gas drum from the shipper’s facility to the port of Marghera in Italy.

The drum, which measured 48.5 m x 5.6 m x 4.6 m, was transported by road using a tractor unit and trailer from Pasquinelli Ennio’s fleet.

At the port the drum was loaded on to a Hansa Heavy Lift vessel for onward transportation.

Pasquinelli Ennio is a member of the WCA Projects network representing Italy. 

www.pasquinellispa.it

www.wcaprojects.com 

Heavy Lift | News

 Rhenus delivers for circular steam project thumbnail image

Rhenus delivers for circular steam project

July 22 - Earlier this year, Rhenus Project Logistics coordinated the delivery of oversize cargoes destined for LyondellBasell and Covestro’s chemical plant at the Maasvlakte, Rotterdam.
Views: 165
HEBO-Lift 9 back in service thumbnail image

HEBO-Lift 9 back in service

July 22 - After a period of maintenance, HEBO Maritiemservice’s floating sheerleg crane, HEBO-Lift 9, is back in service, transporting and installing six storage tanks at the port of Rotterdam.
Views: 225
Collett delivers footbridge thumbnail image

Collett delivers footbridge

July 19 - Collett & Sons has delivered six over-dimensional bridge components to Worcester in the UK.
Views: 458

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.