Latest news from Heavy Lift & Project Forwarding International Magazine

Project cargo corridors simplify permit procedure in British Columbia

The Ministry of Transportation and Infrastructure in British Columbia and lower mainland ports in the Canadian province have worked together to create project cargo corridors that will simplify the permit approval process for non-divisible loads.

The establishment of the corridors, according to the Ministry of Transportation and Infrastructure, is expected to save the trucking industry time and attract more specialised products through British Columbian ports.

The corridors connect Fraser Surrey Docks and Lynnterm East Gate with the Alberta border at Highway 6.

Pre-approved configurations will be able to obtain permits without completing the traditional extraordinary load approval process.

It applies to commercial vehicles with the following specifications: a configuration of between eight to 13-axle super loads; a gross combined vehicle weight up to 125,000 kg (125 tonnes); an overall height up to 4.88 m; an overall width up to 5 m; and an overall length up to 50 m.

Inter-axle spacing and axle spreads are controlled for these pre-approved vehicles. Other vehicle combinations will still need to use the extraordinary load approval process, which can take up to 12 business days. “This is because of the analysis required to ensure the vehicle’s weight and dimensions will not damage infrastructure along the trip route,” explained the Ministry of Transportation and Infrastructure.

By having pre-approved vehicle specifications and routing in place, trip approvals on these project cargo corridors can occur within two business days.

The new permit process will be evaluated throughout the first year of operation, with potential to expand to other highway corridors in the future.

www2.gov.bc.ca

Heavy Lift | News

Still time to enter ESTA Awards  thumbnail image

Still time to enter ESTA Awards 

January 17 - The deadline to enter the 2020 ESTA Awards of Excellence, which will be held on the evening of April 23 at the Postillion Hotel Amsterdam in the Netherlands, has been extended to January 25, 2020. 
Views: 355
Wijnne Barends opts for LNG newbuilds  thumbnail image

Wijnne Barends opts for LNG newbuilds 

January 17 - Wijnne Barends, based in the Netherlands, has placed an order with China’s WuHu Shipyard for four shortsea cargo ships featuring LNG propulsion and battery storage systems.
Views: 511
Bati handles yacht move  thumbnail image

Bati handles yacht move 

January 17 - Bati Group has coordinated the transport of a yacht from Turkey to Greece. 
Views: 416
Methanex hat trick for Mammoet thumbnail image

Methanex hat trick for Mammoet

January 17 - Methanex has awarded the levee crossing and heavy haul scope of work for the construction of its Geismar 3 methanol plant in Louisiana, USA to Mammoet.
Views: 471

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.