Eleven Danir 19 has handled 520 pieces of mining equipment at the port of Riga in Latvia.

The 520 pieces of metal structures included various out-of-gauge (OOG) components, which measured up to 7 m wide. The total weight of the cargo handled was 1,917 tonnes.

Eleven Danir 19 oversaw the transport of the cargoes on more than 150 trucks with the assistance of pilots and police escorts for the OOG pieces. The project scope also included forming the loading plan arrangements and conducting operations surveys, receiving the cargo from the ship, sorting, as well as overseeing outdoor and indoor storage.

Eleven Danir 19 is a member of the Project Cargo Network (PCN).

www.projectcargonetwork.com

www.11d19.com