Latest news from Heavy Lift & Project Forwarding International Magazine

Enerpac barges into Antwerp

Roll-iT has recently used an Enerpac JS-250 jack-up system to assist with the transport a 300-tonne bridge deck from Ghent to Antwerp, through the Belgian canal network, onboard a Victrol pontoon.

It was impractical to use a crane due to the disruption to local traffic and services, and Roll-iT needed to raise the bridge deck by 10 m to ensure complete clearance and avoid obstacles.

The bridge deck on the Victrol pontoon ready for the 50km journey to Antwerp.

 

Roll-iT used a combination of 2 x 12-axle SPMT files and an Enerpac JS-250 jack-up system to lift the bridge deck and transport it onto the pontoon. Once the bridge deck was loaded, the jack-up towers were fully lowered and securely fastened to increase the pontoon's stability. 

Raising the bridge deck ready for installation.

 

The new Londonburg Bridge will replace the previous bridge in Antwerp, and will accommodate two traffic lanes, foot and cycle paths, and a tram line.

 

www.enerpac.com

www.roll-it.be

www.victrol.be

Heavy Lift | News

Tschudi delivers for Belgian paper mill thumbnail image

Tschudi delivers for Belgian paper mill

August 22 - Tschudi Logistics has coordinated the delivery of five digesters and a liquor accumulator for Burgo Ardennes’ paper mill in Belgium.
Views: 212
ACS delivers in Japan thumbnail image

ACS delivers in Japan

August 20 - Air Charter Service (ACS) has coordinated the shipment of a 35-tonne flight simulator from Texas to Japan using a Boeing 747.
Views: 357

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.