Latest news from Heavy Lift & Project Forwarding International Magazine

EXG completes cross country move

Express Global Logistics (EXG) has transported a 55-tonne module from west to east India.

The waste heat recovery unit (WHRU) measured 8.6 m x 5.45 m x 5.2 m and was moved 3,700 km over 66 days. A six-member crew was deployed for the project and an escort vehicle shadowed the transport along the route.

The total height of the module along with the trailer and axles was 6.4 m. Given that road signs are installed at an average height of 5.5 m, according to EXG, a plan for these to be dismantled along the route was essential.

India’s nationwide Covid-19 lockdown measures also made the project move challenging. EXG said that its crew was able to arrange all necessary permissions to ensure there was no delay to the delivery schedule.

EXG is a member of the Worldwide Project Consortium (WWPC).

www.expressworld.com

www.wwpc.eu.com

Heavy Lift | News

BigRoll Beaufort moves for Virginia wind farm thumbnail image

BigRoll Beaufort moves for Virginia wind farm

May 29 - Roll Group has transported wind energy components using its vessel BigRoll Beaufort to assist in the construction of a wind farm 27 miles (43 km) off the coast of Virginia, USA.
Views: 709
First turbine installed at Borssele III and IV thumbnail image

First turbine installed at Borssele III and IV

May 29 - Van Oord’s offshore installation vessel Aeolus has installed the first of 77 MHI Vestas wind turbines at the Borssele III and IV offshore wind project off the coast of the Netherlands.
Views: 526

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.