Latest news from Heavy Lift & Project Forwarding International Magazine

Paderewski completes maiden call in Emden

Chipolbrok’s multipurpose vessel Paderewski made its maiden call at the German port of Emden to load wind energy equipment destined for Masan, South Korea.

Before the vessel arrived in Emden, Chipolbrok called in Hamburg to load several pieces of project and breakbulk cargo, including a 330-tonne gas turbine.

Once in Emden, 38 wind energy components, with a total weight of 538 tonnes, were secured on Paderewski. The largest pieces had a maximum length of 40.6 m and unit weights of up to 22 tonnes.

They were loaded onto the vessel on behalf of a Japanese logistics provider, representatives of which oversaw the handling and securing procedures. According to Chipolbrok, the stevedores were able to load all the components within 36 hours, which meant the vessel could depart the next morning.

After transiting the Suez Canal, Paderewski will call at Mumbai (India), Singapore, Kaohsiung (Taiwan) and Shanghai (China) before arriving in Masan at the end of September.

chipolbrok.com.pl

Heavy Lift | News

Laso begins Alecrim-Urze wind farm project thumbnail image

Laso begins Alecrim-Urze wind farm project

February 20 - Laso Transportes has been tasked with the transport of several wind energy components for the Alecrim-Urze wind farm in Paúl da Serra, on the island of Madeira.
Views: 279
AAL ships super-yacht component  thumbnail image

AAL ships super-yacht component 

February 20 - AAL has transported an 85.3 m-long yacht hull from Humen, China to Henderson in Western Australia, on board the 19,000 dwt S-Class multipurpose vessel AAL Dampier.
Views: 279

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.