Latest news from Heavy Lift & Project Forwarding International Magazine

Puylobo blades arrive at Bilbao

42 wind turbine blades that will form part of Iberdrola's Puylobo wind farm in Aragón, Spain, have been unloaded at the port of Bilbao.

The blades were manufactured by Siemens Gamesa in China and were delivered to Spain aboard the heavy transport ship Zhi Xian Zhi Xing.

Departing Qinhuangdao on March 7, the ship sailed approximately 20,000 km to the port of Bilbao via the Straits of Malacca, the Gulf of Bengal, the west cost of India, the Gulf of Aden, the Suez Canal and the Mediterranean Sea.

The EUR50 million (USD54.25 million) Puylobo wind farm will comprise 14 SG 3.4-132 wind turbines when it comes online at the end of 2020.

The rest of the wind turbine components – including towers, nacelles/hubs, generators, gearboxes and transformers – are being manufactured at facilities in Asturias, Cantabria, Soria and Burgos. The manufacturers also have a storage terminal in the port of Bilbao itself. Port stevedores and companies such as Servicios Logísticos Portuarios (SLP) and Transporte Aguado have taken active part in the unloading and transfer operations.

www.bilbaoport.eus

Heavy Lift | News

Mammoet’s fast delivery thumbnail image

Mammoet’s fast delivery

May 28 - Mammoet has employed its Trailer Power Assist (TPA) system to transport the first two toroidal field coils that form part of the ITER project in France.
Views: 220
BigLift delivers to Port of Virginia thumbnail image

BigLift delivers to Port of Virginia

May 27 - Norfolk International Terminals (NIT), Virginia Port Authority’s largest terminal, has received its final set of rail mounted gantry cranes.
Views: 508

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.