Latest news from Heavy Lift & Project Forwarding International Magazine

Sarens loads out in Wallsend

Sarens has loaded out a 580-tonne pile template in Wallsend, UK on behalf of Van Oord.

Van Oord is responsible for installing 102 three-legged jacket foundations for Scottish Power Renewables (part of the Iberdrola Group), which is building the East Anglia ONE offshore wind farm in the North Sea.

To transport the offshore structure, which had a diameter of 38 m, Sarens utilised link spans measuring 21 m in length.

While most of the equipment used for the load-out, including SPMTs and mobile cranes, arrived at the project site from the UK, the link spans were delivered from the Netherlands.

During the load-out operation, Sarens had to line up the pile template with the link span design before driving the structure on to a barge for onward transportation.

www.sarens.com

www.vanoord.com

Heavy Lift | News

Tschudi delivers for Belgian paper mill thumbnail image

Tschudi delivers for Belgian paper mill

August 22 - Tschudi Logistics has coordinated the delivery of five digesters and a liquor accumulator for Burgo Ardennes’ paper mill in Belgium.
Views: 16
ACS delivers in Japan thumbnail image

ACS delivers in Japan

August 20 - Air Charter Service (ACS) has coordinated the shipment of a 35-tonne flight simulator from Texas to Japan using a Boeing 747.
Views: 326

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.