Latest news from Heavy Lift & Project Forwarding International Magazine

Blue Water loads Sandbank project

September 3 - Blue Water Shipping has helped load monopiles and transition pieces for the Sandbank wind farm onboard the installation vessel Pacific Orca at the Danish port of Esbjerg.

The 72 foundations, which are destined for Bilfinger's Sandbank offshore wind farm in the German part of the North Sea, are transported to Esbjerg via barge, before being loaded onto Pacific Orca by Blue Water's stevedores.

When completed in 2017, the Sandbank wind farm will be able to supply more than 400,000 households with green electricity.

 

 

www.bws.dk

Heavy Lift | News

Still time to enter ESTA Awards  thumbnail image

Still time to enter ESTA Awards 

January 17 - The deadline to enter the 2020 ESTA Awards of Excellence, which will be held on the evening of April 23 at the Postillion Hotel Amsterdam in the Netherlands, has been extended to January 25, 2020. 
Views: 445
Wijnne Barends opts for LNG newbuilds  thumbnail image

Wijnne Barends opts for LNG newbuilds 

January 17 - Wijnne Barends, based in the Netherlands, has placed an order with China’s WuHu Shipyard for four shortsea cargo ships featuring LNG propulsion and battery storage systems.
Views: 647
Bati handles yacht move  thumbnail image

Bati handles yacht move 

January 17 - Bati Group has coordinated the transport of a yacht from Turkey to Greece. 
Views: 606
Methanex hat trick for Mammoet thumbnail image

Methanex hat trick for Mammoet

January 17 - Methanex has awarded the levee crossing and heavy haul scope of work for the construction of its Geismar 3 methanol plant in Louisiana, USA to Mammoet.
Views: 591

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.