Latest news from Heavy Lift & Project Forwarding International Magazine

DEME orders Orion

March 1 - DEME has ordered an offshore installation vessel, Orion, which will be built at a Cosco shipyard in China.

Orion will be deployed by DEME's subsidiary, GeoSea, for the construction and decommissioning of offshore wind farms as well as to service the oil and gas industry.

Orion will be equipped with a crane that has a lifting capacity of 3,000 tonnes at more than 50 m. The loads can be lifted to a height of more than 170 m, while deck space has been maximised to provide high transport and load capacity.

Luc Vandenbulcke, managing director at GeoSea, said: "With Orion we will be uniquely positioned to meet the future requirements of our customers and the trend towards larger capacity turbines and bigger wind farm projects, delivering energy at lower costs. Orion will be capable of installing mega monopiles at greater depths. With DP3 technology the offshore installation vessel can continue operations under the most challenging conditions."

According to the marine engineering company, Orion has dual fuel engines and can run on liquefied natural gas (LNG). It also features a waste heat recovery system that converts heat from the exhaust gasses and cooling water to electrical energy.

The 216.5 m long Orion can accommodate a crew of up to 131 people and is scheduled for delivery in 2019.

 

Artist impression of Orion

www.deme-group.com

www.deme-group.com/geosea

Heavy Lift | News

UAL vessels gather in Antwerp thumbnail image

UAL vessels gather in Antwerp

August 23 - Three Universal Africa Lines (UAL) ships have been spotted at the port of Antwerp. All three are being loaded with cargoes destined for West Africa.
Views: 418
Höegh rolls to Mombasa thumbnail image

Höegh rolls to Mombasa

August 23 - Höegh Autoliners has shipped 100 breakbulk units destined for a cement plant in Kenya on using two of its ro-ro services.
Views: 383
ALE-Giant executes Formosa works thumbnail image

ALE-Giant executes Formosa works

August 23 - ALE has established a joint venture with Giant Taiwan to handle the movement, transport and storage of wind turbine foundations for the Formosa 1 Phase 2 wind farm.
Views: 321

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.