Latest news from Heavy Lift & Project Forwarding International Magazine

Kaleido winds up Mexican project

March 10 - Kaleido has completed a project to transport components for 43 wind turbines from China, Vietnam and Spain to the Mexican Port of Altamira for installation at a wind farm site in Jalisco.

The 43 turbines were delivered to Mexico in nine separate shipments. 19 nacelles, 19 hubs, 19 cones and 33 blades were shipped from Bilbao, Spain to Altamira; 24 nacelles, 24 hubs and 24 cones originated in Sagunto, Spain; 96 wind turbine blades were moved from China's Dafeng port to Mexico; while 172 wind turbine tower sections were delivered from Vietnam's Phu My port.

Kaleido was responsible for the sea freight and overland transport, as well as port operations and lashing and welding works.

During the project Kaleido deployed its certified tool designed for the calculation and reporting of emissions, Karbon Track, which evaluates the environmental impact of the entire logistics contract.

 

 

 

www.kaleidologistics.com

Heavy Lift | News

Fitzgerald returns to Crowley  thumbnail image

Fitzgerald returns to Crowley 

February 21 - Crowley Maritime Corporation has appointed Ray Fitzgerald as its chief operating officer, effective March 1. 
Views: 192
KENC completes engineering scope for Jumbo thumbnail image

KENC completes engineering scope for Jumbo

February 21 - The Netherlands-based KENC Engineering has collaborated with Jumbo to prepare the heavy lift vessel Fairplayer for an FPSO installation project offshore Brazil. 
Views: 192

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.