Latest news from Heavy Lift & Project Forwarding International Magazine

Rotor blades spin with Prangl

July 5 - Prangl recently transported three wind turbine rotor blades, each almost 50 m long and four metres at the widest point, writes Adam Flensborg Safikhany.

Each of the blades was loaded on a three or four-axle trailer and transported safely on the motorway between Magdeburg, Germany and Munchhof, Austria.

www.prangl.at

Heavy Lift | News

UAL vessels gather in Antwerp thumbnail image

UAL vessels gather in Antwerp

August 23 - Three Universal Africa Lines (UAL) ships have been spotted at the port of Antwerp. All three are being loaded with cargoes destined for West Africa.
Views: 236
Höegh rolls to Mombasa thumbnail image

Höegh rolls to Mombasa

August 23 - Höegh Autoliners has shipped 100 breakbulk units destined for a cement plant in Kenya on using two of its ro-ro services.
Views: 209
ALE-Giant executes Formosa works thumbnail image

ALE-Giant executes Formosa works

August 23 - ALE has established a joint venture with Giant Taiwan to handle the movement, transport and storage of wind turbine foundations for the Formosa 1 Phase 2 wind farm.
Views: 188

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.