Latest news from Heavy Lift & Project Forwarding International Magazine

Tandem lift for cylinder in Brake

August 20 - In the port of Brake, Germany, two Liebherr mobile harbour cranes - a LHM 550 and a LHM 500 - were used to offload a 150-tonne cylinder destined for a new paper production line at Alfeld in Lower Saxony.

The cylinder was brought into Brake from Karlstad, Sweden, onboard Erik Thun AB's coaster, Eken, for the Finnish paper manufacturer Metso.

In Brake, the dedicated terminal for general and project cargoes is operated by J. MÜLLER Breakbulk Terminal GmbH & Co. KG.

Over the course of four days, one of  Kübler Spedition's vehicles was used to deliver the cylinder to the new production line of the South African paper group Sappi Alfeld.

The overall dimensions of the heavy transport was 42 m in length, 6.60 m wide and 7.80 m high; with a total weight of over 250 tonnes.


www.seaports.de/www.seaports-offshore.de

www.thun.se

www.kuebler-spedition.de

Heavy Lift | News

Fitzgerald returns to Crowley  thumbnail image

Fitzgerald returns to Crowley 

February 21 - Crowley Maritime Corporation has appointed Ray Fitzgerald as its chief operating officer, effective March 1. 
Views: 183
KENC completes engineering scope for Jumbo thumbnail image

KENC completes engineering scope for Jumbo

February 21 - The Netherlands-based KENC Engineering has collaborated with Jumbo to prepare the heavy lift vessel Fairplayer for an FPSO installation project offshore Brazil. 
Views: 183

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.