Latest news from Heavy Lift & Project Forwarding International Magazine

Vernazza dismantles railway bridge

Crane service provider Vernazza Autogru has dismantled an old steel railway bridge near Cannes, using a Demag CC 3800-1 crawler crane.

The project involved lifting and removing a total of eight heavy steel components that measured up to 22 m long, 6 m wide, and 8 m tall, and weighed up to 115 tonnes.

The Viaduc de la Siagne bridge in Mandelieu-la-Napoule had to be taken down within a timeframe of just 130 hours – before the railway line opened again for normal operations.

Space at the riverside site was also restricted, but the CC 3800-1’s crawler width of 2 m was compact enough to operate at the premises.

This was the first time that Vernazza had used the CC 3800-1. “We just received the crane from the manufacturing plant in Zweibrücken a few days ago. It actually took 45 transportation trucks to deliver it here to the south of France, where it will get the chance to prove its mettle right away,” said Vernazza France general director Paolo Delfino.

The company used its Demag AC 120 to set up and disassemble the crawler crane and its superlift system.

vernazzautogru.com

www.terex.com

Heavy Lift | News

GPLN delegates convene in Bremen thumbnail image

GPLN delegates convene in Bremen

May 23 - More than 180 delegates of the Global Project Logistics Network (GPLN) convened at the Dorint Park Hotel in Bremen earlier this week for the group’s 16th annual meeting.
Views: 76
Big Carl arrives at Bristol Port thumbnail image

Big Carl arrives at Bristol Port

May 23 - Sarens’ SGC 250 crane is presently in storage at Bristol Port, UK ahead of its delivery to the Hinkley Point C nuclear power plant.
Views: 95
Liebherr delivers for Eurogruas thumbnail image

Liebherr delivers for Eurogruas

May 22 - Spanish crane rental and heavy lift service provider Eurogruas has taken delivery of an 800-tonne lifting capacity crawler crane from Liebherr.
Views: 297
Superior bridge service with Imperial thumbnail image

Superior bridge service with Imperial

May 22 - Imperial Crane Services and Superior Construction have utilised a Liebherr LR1300 SX crawler crane to lift six concrete beams for the Chase Street bridge replacement project in California, USA.
Views: 342

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.