Latest news from Heavy Lift & Project Forwarding International Magazine

Final Deutsche Bucht foundations depart Cuxport

Cuxport Terminal in Germany welcomed Seajacks’ installation vessel Scylla on December 30 to load the final foundation structures for the Deutsche Bucht offshore wind farm.

Balance of plant contractor Van Oord has used Cuxport for the storage and transhipment of monopoles and transition pieces for Northland Power’s Deutsche Bucht offshore wind farm since August 2018. In total, Seajacks’ vessel Scylla has loaded 31 transition pieces, each weighing approximately 300 tonnes, and monopiles, weighing approximately 1,100 tonnes.

According to Cuxport, Van Oord completed the installation of the final foundation structures earlier this month.

www.cuxport.de

www.seajacks.com

Heavy Lift | News

Gantry on the move thumbnail image

Gantry on the move

June 13 - Collett & Sons loaded a 100-tonne gantry onto double bogie trailers ahead of a 250 mile (402.3 km) journey from the heavy haulier's depot in Goole to Gatwick, UK.
Views: 481
Pipeline shipment for Dimerco thumbnail image

Pipeline shipment for Dimerco

June 13 - Dimerco has delivered 33 tons (30 tonnes) of valves for an aviation fuel pipeline that will connect with the under-construction Beijing Daxing International Airport.
Views: 422
Heavy Lift Awards shortlist announced thumbnail image

Heavy Lift Awards shortlist announced

June 12 - After a rigorous judging process by our panel of industry experts, the shortlist has been revealed for the Heavy Lift Awards 2019.
Views: 855

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.