Latest news from Heavy Lift & Project Forwarding International Magazine

Oxbo is busy in Oregon

Oxbo Mega Transport Solutions has removed three transformers, units, weighing 130,000 lbs (59 tonnes) each, from the Dalles dam in Washington, USA.

The units, which were removed with a jack and slide system, and measured 5 m x 3 m x 4.75 m. They were transported to Salem, Oregon using a girder bridge trailer.
 

The total gross vehicle weight for each load was 242,000 lbs (109.7 tonnes).

Meanwhile, Oxbo was contracted to transport two evaporator vessels approximately 920 miles (1,480.6 km) from a fabrication facility in Oregon fabrication facility to a chemical plant in central California.

To handle the components, which weighed 138,000 lbs (62.6 tonnes), Oxbo deployed SPMTs from Goldhofer and 13-axle trailers.

The evaporator vessels measured 90 ft (27.4 m) in length.

Oxbo also replaced a set of transformers, weighing 50,000 lbs (22.7 tonnes) each, at a dam in Oregon using a jack and slide system.

www.oxboinc.com

Heavy Lift | News

Record unit at Bilbao thumbnail image

Record unit at Bilbao

February 15 - The port of Bilbao, Spain, has loaded its heaviest-ever cargo: a 2,450-ton (2,223-tonne) ship-to-shore (STS) crane.
Views: 813
V&M chooses Terex for Ultimate project thumbnail image

V&M chooses Terex for Ultimate project

February 15 - V&M Erectors has been busy on the the largest infrastructure project in the Florida Department of Transportation’s (FDOT) history.
Views: 669
Höegh’s ro-ro solution to Dammam thumbnail image

Höegh’s ro-ro solution to Dammam

February 14 - Höegh Autoliners has delivered a 112-tonne transformer, manufactured by CG, from Antwerp to Dammam in Saudi Arabia, on behalf of Kintetsu World Express (KWE).
Views: 629

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.