Latest news from Heavy Lift & Project Forwarding International Magazine

CNC busy with hydro project

December 03 - Malaysia-based CNC Freight is handling turbine components and other mechanical equipment for the Bakun Hydroelectric Project in Sarawak.

The first shipment arrived from Argentina into Bintulu port late last year. The heaviest piece - a stay ring - weighed 78 tonnes and measured 8.75 m in length by 5.30 m in width and 3.70 m in height.

The cargo was transported from Bintulu to the Bakun dam site, approximately 160 km from the seaport, and was transferred to shallow-draft barges for upriver transportation in order to avoid some 21 bridges.

CNC Freight is working with Platetrade - an Argentine forwarder and fellow member of the World Wide Project Consortium - on the transportation project, which is on-going.

Heavy Lift | News

Cargolux calls at Incheon thumbnail image

Cargolux calls at Incheon

July 17 - Cargolux Italia has launched a Boeing 747 service between Milan Malpensa Airport, Italy and Incheon, South Korea.
Views: 211
Express discharge at the port of Tyne thumbnail image

Express discharge at the port of Tyne

July 17 - Höegh Autoliners has transported five Hitachi TransPennine Express train carriages from Kobe, Japan to the port of Tyne in the UK. 
Views: 248

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.