Latest news from Heavy Lift & Project Forwarding International Magazine

Coordinadora carries crane

February 25 - Coodinadora Internacional de Cargas SA has transported a 412-tonne LHM 400 mobile harbour crane from Aragon Quay to Cantabria Quay within the Tarragona Port.

The transport was performed by a heavy lift vessel equipped with a ro-ro ramp, which was adapted to the crane's maximum longitudinal inclination of 2.86 degrees and transversal inclination of 1.15 degrees prior to the loading operation.

Coordinadora designed, prepared and supervised the construction of a reinforced concrete ramp on top of the existing ro-ro ramp at Aragon Quay to save the slope up to 4.92 degrees, while at Cantabria Quay a special wooden bed was prepared to negotiate a slope of 4.37 degrees.

 

 

www.coordinadora.eu

Heavy Lift | News

Egbert joins at Weserport thumbnail image

Egbert joins at Weserport

April 19 - Rudolf Egbert has been appointed to the management of Bremen-based terminal operator Weserport.
Views: 189
Tyne moves Bedford lifeboat thumbnail image

Tyne moves Bedford lifeboat

April 18 - After almost two years in covered storage, the historic Bedford lifeboat has been relocated from the port of Tyne to the North East Maritime Trust’s yard in the UK, ahead of a restoration project.
Views: 259
Panalpina improves profitability thumbnail image

Panalpina improves profitability

April 18 - In the first three months of 2019, Panalpina boosted its profitability by 15 percent compared to the same period of last year.
Views: 375

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.