Latest news from Heavy Lift & Project Forwarding International Magazine

New transport solution for 2 MW nacelles

June 2 - Nooteboom Special Products has invented a system for loading and unloading the extremely heavy generator units of large wind turbines, which avoids the need for a mobile crane. The first three systems have been delivered to the specialised windmi

Each generator - or nacelle as it is more commonly known in the windpower business - makes its way through the production process on a so-called 'base frame' which is subsequently coupled to a tractor trailer unit and transported.

Vestas developed the 'base frame' to reduce the costs of its internal logistics, and subsequently asked Nooteboom to develop the best transport solution for it which uses load floor adaptors and a load floor that can be coupled to them.

Based on the Vestas 'base frame', Nooteboom Special Products' solution makes it possible to load or unload the 2 MW nacelles without a mobile crane. By integrating the flexibility in the coupling of the load floor, loading and unloading becomes possible even on wind turbine locations where there is very little room to manoeuvre.

Heavy Lift | News

Collett delivers footbridge thumbnail image

Collett delivers footbridge

July 19 - Collett & Sons has delivered six over-dimensional bridge components to Worcester in the UK.
Views: 398
ITI and FHS to open Florida training centre thumbnail image

ITI and FHS to open Florida training centre

July 19 - Florida Handling Systems (FHS), a Mazzella Company, and Industrial Training International (ITI) have confirmed that they will develop a training centre in Bartow, Florida.
Views: 500

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.