Latest news from Heavy Lift & Project Forwarding International Magazine

First blade made at Green Port Hull

December 1 - The first turbine blade has been manufactured at Siemens' new wind power factory at Green Port Hull on the UK Port of Hull's Alexandra Dock.

Since 2014, GBP310 million (USD393 million) has been invested into the Green Port Hull site at Alexandra Dock, with Associated British Ports (ABP) - operator of the Port of Hull - contributing GBP150 million (USD190 million) towards developing the area into a hub for offshore wind manufacturing, assembly and logistics.

"The first turbine blade which we have seen manufactured at Siemens' factory at Alexandra Dock is the symbol of two years of hard work and investment by Siemens, ABP and Hull City Council," said ABP's Humber director, Simon Bird.

The wind power factory at Alexandra Dock is intended to manufacture turbine blades for Siemens 7 MW and next-generation 8 MW turbines. They will be among the first supplied to Dong Energy for the Race Bank wind farm off the east coast of the UK.

The site is still being developed, with construction of a new harbour for pre-assembly and load out of wind turbine components continuing into 2017.

 


www.abports.co.uk

 

www.siemens.com

Heavy Lift | News

CLA adopts CHAMP solution thumbnail image

CLA adopts CHAMP solution

May 29 - CargoLogicAir (CLA) has implemented CHAMP’s weight and balance solution for advanced load planning.
Views: 453
Flinders prepares for Konecranes delivery thumbnail image

Flinders prepares for Konecranes delivery

May 29 - Flinders Port Holdings will take delivery of a Konecranes Gottwald Model 6 mobile harbour crane at its facilities in Port Adelaide, Australia during August.
Views: 512
IMH boosts range with SPX Flow thumbnail image

IMH boosts range with SPX Flow

May 29 - Middlesbrough, UK-based Industrial and Marine Hydraulics (IMH) has entered into a distribution agreement with SPX Flow.
Views: 505
BigRoll Beaufort moves for Virginia wind farm thumbnail image

BigRoll Beaufort moves for Virginia wind farm

May 29 - Roll Group has transported wind energy components using its vessel BigRoll Beaufort to assist in the construction of a wind farm 27 miles (43 km) off the coast of Virginia, USA.
Views: 739

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.