Latest news from Heavy Lift & Project Forwarding International Magazine

Al Faris hoists spud leg trio

Crane service provider Al Faris has utilised a Demag CC 3800-1 crawler crane to lift three 130-tonne spud legs from a barge at the Hamriyah shipyard, UAE.

In order to lift the three legs, each of which measured 72 m long, Al Faris had to transport the crawler crane from its location in Dubai Industrial City to the project site.

For the 82 km journey, Al Faris utilised lowbed trailers from its fleet. Upon arrival at the project site, all-terrain cranes were used to set up the CC 3800-1.

The crane was configured with a 108 m long main boom and a super-lift mast with a length of 36 m. The central ballast totalled 50 tonnes, while the super-lift counterweight and counterweight on the superstructure weighed 325 tonnes and 165 tonnes, respectively.

Once the crane was configured, Al Faris lifted the spud legs at a maximum radius of 50 m. They were then set in place with the help of a 150-tonne capacity crawler crane.

alfarisgroup.com

www.terex.com

Heavy Lift | News

FROM THE MAGAZINE: Pumping up power thumbnail image

FROM THE MAGAZINE: Pumping up power

August 19 - As nations reduce their reliance on fossil-fuelled power generation, hydropower projects – in particular pumped storage schemes – will play a key role in supplementing wind and solar energy developments.
Views: 311
Jan De Nul secures Kriegers Flak work thumbnail image

Jan De Nul secures Kriegers Flak work

August 16 - Jan De Nul Group will transport and install 72 Siemens wind turbine generators – with a capacity of 8.4 MW each – for the Kriegers Flak offshore wind farm in Denmark.
Views: 646
Pretty in pink for TGP thumbnail image

Pretty in pink for TGP

August 16 - Trans Global Projects Group (TGP) has delivered 62 modules to a mining site near Newman, Australia.
Views: 567

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.