Latest news from Heavy Lift & Project Forwarding International Magazine

Logistics Plus completes transformer delivery

Logistics Plus has delivered a 325,000-lb (147.4-tonne) transformer to a wind farm in Georgia, USA.

The transformer, which measured 28 ft x 12 ft x 15 ft (8.5 m x 3.66 m x 4.57 m), was transported via rail, then unloaded on to a hydraulic platform trailer, before being hauled to the final placement site.

The move took 25 days from pickup to final placement.

www.logisticsplus.net

Heavy Lift | News

BigLift delivers to Port of Virginia thumbnail image

BigLift delivers to Port of Virginia

May 27 - Norfolk International Terminals (NIT), Virginia Port Authority’s largest terminal, has received its final set of rail mounted gantry cranes.
Views: 436
Towers move through Seville thumbnail image

Towers move through Seville

May 27 - Bergé Maritima has handled wind turbine tower sections at the port of Seville, Spain.
Views: 410
Altius completes Chile shipment thumbnail image

Altius completes Chile shipment

May 26 - Altius has transported two pieces of oversized cargo from Antwerp in Belgium to Mantos Blancos, Chile.
Views: 617

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.