Latest news from Heavy Lift & Project Forwarding International Magazine

DOLL unveils panther upgrades

April 19 - DOLL has displayed a four-axle semi low loader trailer from its panther series at the bauma exhibition, which is equipped with a steerable dolly axle fixed to the gooseneck.

With a payload of 51.7 tonnes at 80 km/h, DOLL says that the T4E-S2A and its 1+3 axle combination is particularly suitable for the transport of heavy construction machinery.

The manufacturer added that the combination of three-axle rear running gear and fixed dolly axle guarantees optimum load distribution.

DOLL claims that the friction-steered one-axle dolly offers a cost-effective alternative to the 2+3 or 2+4 axle combinations that it says have so far been typical for trailers of this payload class.

The dolly axle is firmly fixed to the gooseneck and can be separated from the lowbed behind the dolly. In line with the company's panther running gear concept the dolly axle, just as the rear axles, comes with independent wheel suspension in double-wishbone design.

In the gooseneck itself, DOLL has installed the cylinder for lifting and lowering in its centre. According to the trailer manufacturer, this design requires little space, leading to a better force flux. The centrally placed cylinder allows the fifth-wheel load to be adjusted variably from 17.5 to 25 tonnes via electronic control.

The T4E-S2A on display at bauma also has hydraulic rear ramps, a hydraulically liftable lowbed and drive-over height of as little as 780 mm when the running gear has been lowered, said DOLL.

DOLL also revealed its T4E-S3F at the show in Munich, which is also equipped with friction-steered dolly axle fixed to the gooseneck and has been designed with a lowbed in flatbed version especially for the haulage of high and heavy construction machinery.

The loading height is 305 mm combined with a ground clearance of 80 mm when loaded. The preload of the frame structure allows the lowbed to reach a horizontal position and prevents deflection, noted DOLL. Despite the low height, the frame has been engineered for heavy loads and has a maximum payload of 50 tonnes.

www.doll-oppenau.com

Heavy Lift | News

Challenges facing towage and offshore operators thumbnail image

Challenges facing towage and offshore operators

September 20 - Sandro Lipani, director chartering and operations for Malta-based Augustea Maritime Transportation, discusses some of the challenges of operating in the towage and offshore support sector.
Views: 384
Allseas wins decommissioning work thumbnail image

Allseas wins decommissioning work

September 20 - Allseas has been awarded a contract for the removal, transfer, load in and disposal of the Gyda platform in the Norwegian part of the North Sea.
Views: 268
Innovation overhauled thumbnail image

Innovation overhauled

September 20 - DEME’s offshore installation vessel Innovation has undergone a major refit at Damen’s Verolme shipyard in Rotterdam.
Views: 302
Sun shines with Chipolbrok thumbnail image

Sun shines with Chipolbrok

September 20 - Chipolbrok has delivered a range of heavy and oversized components using its vessel Chipolbrok Sun, including 56 wind turbine tower sections in Piteå, Sweden.
Views: 271

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.