Latest news from Heavy Lift & Project Forwarding International Magazine

Installation of condenser with CC2800 Crane

February 22 -Work doesn't stop for ALE Heavylift at the Artenius petrochemical plant at Sines in Portugal and the company has executed the installation of two additional condensers.

The company utilised its CC2800 crane, configured with a 66 m main boom with superlift and without a counterweight to perform the installation with the crane working at a 22 m radius (pictured below).

A second reactor condenser weighing 95 tonnes was then installed requiring the CC2800 crane, which has a lift capacity of 600 tonnes, to work without a counterweight at a 19 m radius (pictured below).

Heavy Lift | News

Fitzgerald returns to Crowley  thumbnail image

Fitzgerald returns to Crowley 

February 21 - Crowley Maritime Corporation has appointed Ray Fitzgerald as its chief operating officer, effective March 1. 
Views: 402
KENC completes engineering scope for Jumbo thumbnail image

KENC completes engineering scope for Jumbo

February 21 - The Netherlands-based KENC Engineering has collaborated with Jumbo to prepare the heavy lift vessel Fairplayer for an FPSO installation project offshore Brazil. 
Views: 338

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.