Latest news from Heavy Lift & Project Forwarding International Magazine

Jan De Nul secures Kriegers Flak work

Jan De Nul Group will transport and install 72 Siemens wind turbine generators – with a capacity of 8.4 MW each – for the Kriegers Flak offshore wind farm in Denmark.

During 2017 and 2018, Jan De Nul delivered two gravity-based foundations for the wind farm.

The offshore wind farm is located in the Baltic Sea in water depths between 15-30 m. During 2017 and 2018, Jan De Nul built, towed and installed two large gravity-based foundations for the wind farm’s offshore substations.

Installation works for the next stage of the project will begin in 2021. Jan De Nul said the work will take approximately four months to complete.

www.jandenul.com

Heavy Lift | News

Höegh Autoliners names CEO thumbnail image

Höegh Autoliners names CEO

June 3 - Norwegian ro-ro shipping group Höegh Autoliners has named Andreas Enger as ceo, effective September 8, 2020.
Views: 275
Volga Dnepr delivers to Dutch Caribbean thumbnail image

Volga Dnepr delivers to Dutch Caribbean

June 3 - Russia-based Volga Dnepr Airlines has delivered oversized and urgent medical supplies to the remote Dutch Caribbean islands St Maarten and St Eustatius in response to Covid-19.
Views: 283
Rotterdam moves ahead with rail link thumbnail image

Rotterdam moves ahead with rail link

June 2 - A steel arch bridge has been installed across the Thomassentunnel and the A15 and N15 motorways in the Netherlands, forming a key link in the port of Rotterdam’s proposed Theemswegtracé railway line.
Views: 612

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.