Latest news from Heavy Lift & Project Forwarding International Magazine

Russian silo move for Van der Vlist

January 7 - Van der Vlist has transported two 15-tonne silos and three truckloads of parts from central Europe to Saratov in south western Russia.

The three tilt trucks carrying parts for the silos drove straight to the destination with all documents pre-arranged, which ensured smooth passage through multiple countries and no delays in Customs clearance.
 
Due to size of the silos, which had the dimensions 18 m x 3.6 m x 3.3 m, the OOG consignments were transported 1,000 km by road to north Germany, where they were loaded onto a ferry and shipped to St Petersburg.
 
From the port of St Petersburg, Van der Vlist arranged the further 1,600 km road transport to Saratov.

 

 

www.vandervlist.com

Heavy Lift | News

Fitzgerald returns to Crowley  thumbnail image

Fitzgerald returns to Crowley 

February 21 - Crowley Maritime Corporation has appointed Ray Fitzgerald as its chief operating officer, effective March 1. 
Views: 509
KENC completes engineering scope for Jumbo thumbnail image

KENC completes engineering scope for Jumbo

February 21 - The Netherlands-based KENC Engineering has collaborated with Jumbo to prepare the heavy lift vessel Fairplayer for an FPSO installation project offshore Brazil. 
Views: 440

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.