Latest news from Heavy Lift & Project Forwarding International Magazine

STS crane loaded at Bilbao

Grupo Altius has coordinated the loading of a fully erected ship-to-shore (STS) crane at the port of Bilbao, Spain in cooperation with Marítima Davila and Toro y Betolaza.

It took 12 hours to load the 1,280-tonne Kalmar crane, which was 68 m tall and 27 m wide, onto BigLift’s multipurpose Happy Star vessel. It was brought alongside the ship on SPMTs and lifted on board using the ship’s own cranes.

The crane is bound for a container terminal in Guadalupe.

www.grupoaltius.com

www.mdavila.com

www.torobe.com

www.bigliftshipping.com

Heavy Lift | News

Steel shipment for Alistair thumbnail image

Steel shipment for Alistair

April 2 - Alistair Group has transported steel structures from Durban, South Africa to Kolwezi in the Democratic Republic of the Congo.
Views: 292
Boskalis issues Covid-19 update thumbnail image

Boskalis issues Covid-19 update

April 2 - Royal Boskalis Westminster has suspended crew and project staff rotations in response to the outbreak of Covid-19, but cargo is still moving.
Views: 316

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.