Latest news from Heavy Lift & Project Forwarding International Magazine

Jackets on at the port of Tyne

Heerema Marine Contractors' (HMC) deepsea heavy lift vessel, Aegir, is preparing to commence lifting operations at the port of Tyne's Northumbrian Quay in North Shields, UK.

A number of wind turbine jackets, measuring between 68 and 81 m high and weighing up to 1,300 tonnes, will be towed downriver on a barge from the Smulders Projects UK manufacturing facility, based in Wallsend, to the deepwater berth at the port of Tyne.

The 4,000-tonne lift capacity Aegir will then come alongside the barge and utilise its 125 m-long, 96 m-high crane to lift a jacket. After securing, Aegir will then sail to Scotland with the jacket suspended from its crane, over the side of the vessel, before returning to the port of Tyne to repeat the operation for the remaining structures.

Aegir is expected to return from Scotland every three days to complete a total of five lifting operations.

Steven Clapperton, port of Tyne's harbour master and director of health and safety, environment and marine, said: "The size of the ship, with its 4,000-tonne revolving heavy lift crane, and the complexity of the operation make the port of Tyne's Northumbrian Quay ideally placed to handle this work, due to its deepwater and close proximity to open sea."

 

www.portoftyne.co.uk

www.heerema.com

Heavy Lift | News

Antonov soars with satellite shipment thumbnail image

Antonov soars with satellite shipment

February 20 - Antonov Airlines has transported the GSAT-31 communication satellite for the Indian Space Research Organisation (ISRO) on behalf of Flywell Aviation.
Views: 559
ESTA decides on ECOL management thumbnail image

ESTA decides on ECOL management

February 20 - The final structure of ESTA’s planned European Crane Operators Licence (ECOL) scheme is taking shape, as the organisation readies for its launch later this year.
Views: 860
AAL delivers for Stockyard thumbnail image

AAL delivers for Stockyard

February 19 - AAL has transported a 305-tonne Toshiba transformer for Australia’s Stockyard Hill wind farm in Victoria on behalf of Cargo Line International. 
Views: 678
Mammoet in massive quench tower lift thumbnail image

Mammoet in massive quench tower lift

February 19 - Mammoet has utilised its MSG80 ring crane to hoist a 2,000-ton (1,814-tonne) quench tower into position at Shell’s Pennsylvania chemicals project in Potter Township, USA.
Views: 778

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.