Latest news from Heavy Lift & Project Forwarding International Magazine

Modern transformer delivery

Modern Shipping Agencies has coordinated the transport of a 50-ton (45.4-tonne) transformer at Karachi port in Pakistan.

Modern Shipping transported the unit, which measured 6.8 m x 2.68 m x 3.22 m, from India to Pakistan on a 40 ft flatrack container.

The Pakistan-headquartered company also handled the delivery of two oversized units to Hamad port in Qatar.

The first unit measured 13.3 m x 2.6 m x 4 m and weighed 36.4 tonnes; the second unit measured 13.3 m x 2.6 m x 4 m and weighed 37.6 tonnes.

Both units were loaded on a container vessel for transport from Pakistan.

moderngroup.com.pk

Heavy Lift | News

Modulift performs locomotive lift thumbnail image

Modulift performs locomotive lift

May 24 - Modulift has provided equipment to lift a steam locomotive, built in 1926, on behalf of Swanage Railway, a tourist attraction in the UK.
Views: 211
DSV soars with generator component  thumbnail image

DSV soars with generator component 

May 24 - DSV has transported a 40-tonne generator component on board a Volga-Dnepr Ilyushin IL-76 from Germany to Australia for Siemens. 
Views: 239
Big Carl arrives at Bristol Port thumbnail image

Big Carl arrives at Bristol Port

May 23 - Sarens’ SGC 250 crane is presently in storage at Bristol Port, UK ahead of its delivery to the Hinkley Point C nuclear power plant.
Views: 437
Superior bridge service with Imperial thumbnail image

Superior bridge service with Imperial

May 22 - Imperial Crane Services and Superior Construction have utilised a Liebherr LR1300 SX crawler crane to lift six concrete beams for the Chase Street bridge replacement project in California, USA.
Views: 502

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.