Latest news from Heavy Lift & Project Forwarding International Magazine

Van der Vlist in blade delivery

Van der Vlist is transporting 150 wind turbine blades for the Windpark Wieringermeer in the Netherlands.

The first batch of 30 blades, each measuring 58.5 m long, arrived at Van der Vlist’s terminal in Moerdijk on board Enercon’s vessel E-Ship.

All 150 blades will be transported to Moerdijk from Turkey. Van der Vlist is also responsible for the road transport of the tower sections and other components from Germany.

www.vandervlist.com

Heavy Lift | News

DSV soars with generator component  thumbnail image

DSV soars with generator component 

May 24 - DSV has transported a 40-tonne generator component on board a Volga-Dnepr Ilyushin IL-76 from Germany to Australia for Siemens. 
Views: 35
Big Carl arrives at Bristol Port thumbnail image

Big Carl arrives at Bristol Port

May 23 - Sarens’ SGC 250 crane is presently in storage at Bristol Port, UK ahead of its delivery to the Hinkley Point C nuclear power plant.
Views: 237
Superior bridge service with Imperial thumbnail image

Superior bridge service with Imperial

May 22 - Imperial Crane Services and Superior Construction have utilised a Liebherr LR1300 SX crawler crane to lift six concrete beams for the Chase Street bridge replacement project in California, USA.
Views: 408
EGL in transformer move thumbnail image

EGL in transformer move

May 21 - Egyptian Global Logistics (EGL) has unloaded and transported two transformers destined for a power station at Damietta Furniture City.
Views: 394

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.