Latest news from Heavy Lift & Project Forwarding International Magazine

Edwards debuts Faktor 5

February 12 - Edwards Moving & Rigging has used its new 500-tonne capacity Goldhofer Faktor 5 high girder bridge for the first time in the delivery of a 490,817 lb (222-tonne) steam generator turbine in northern Virginia.

As part of a large power plant project, the steam generator turbine was transported over 28 miles (45 km) by road, crossing over 21 bridge structures.

After months of planning and coordination with local, county and state authorities, the Department of Transportation (DOT) and Department of Motor Vehicle representatives, the 439 ft x 21.4 ft x 16.4 ft (133 m x 6.5 m x 4.9 m) girder bridge was pulled along the route by four of Edwards' Kenworth prime movers.

Edwards says that the modular design and containerised load-out capability of its Faktor 5 provides rapid and easy mobilisation for projects in North America and abroad. The girder bridge has a deadweight to payload ratio of 5:1 with adjustable loading lengths and widths.

 

 

www.edwardsmoving.com

www.goldhofer.de

Heavy Lift | News

ACE Belgium readies for launch thumbnail image

ACE Belgium readies for launch

April 25 - ACE Belgium Freighters is preparing to launch its scheduled and charter services out of Liège Airport after receiving its air operator’s certificate (AOC) from the Belgian Civil Aviation Authority.
Views: 224
Carrick joins ACS board thumbnail image

Carrick joins ACS board

April 25 - UK-headquartered charter specialist Air Charter Service (ACS) has named Richard Carrick as a non-executive director to its group board.
Views: 213
Baltimore sets cargo record thumbnail image

Baltimore sets cargo record

April 24 - Combined international cargo throughput at the state-owned and privately owned marine terminals at the port of Baltimore totalled a record 43 million tons in 2018.
Views: 410

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.