Latest news from Heavy Lift & Project Forwarding International Magazine

Steder handles multiple loads for Van Oord 

Steder Group has coordinated the transport of equipment on behalf of Van Oord from Nigeria to the UAE. 

The project involved moving 4,000 cu m of cargo from Port Harcourt to Ras Al Khaimah; 1,000 tonnes and was loaded on Zeamarine’s multipurpose vessel Industrial Fusion. 

After unloading the equipment, Steder Group coordinated the loading of 17,500 cu m (6,000 tonnes) of cargo destined for a refinery project in Dos Bocas, Mexico. Approximately 4,500 tonnes of cargo, comprising mostly of reclamation equipment, was loaded at Van Oord’s quay in Ras Al Khaimah Maritime City. 

However, due to draught restrictions in the channel, the final 1,500 tonnes of cargo was loaded at a neighbouring port in Saqr.

Anchor handling and side wire pontoons were towed to Saqr port from from Van Oord’s facility, moored and then lifted onto the vessel. Smaller items were delivered to Saqr by road.

Steder Group is a member of Worldwide Project Consortium (WWPC) for the Netherlands.

www.stedergroup.com

www.wwpc.eu.com

Heavy Lift | News

Decarbonising shipping comes at a USD1 tn cost thumbnail image

Decarbonising shipping comes at a USD1 tn cost

January 22 - At least USD1 trillion of capital investment in land-based and ship-related infrastructure is required to reach the 2050 goal of reducing shipping’s greenhouse gas emissions by 50 percent of 2008 levels.
Views: 66
Cranes arrive in Brownsville thumbnail image

Cranes arrive in Brownsville

January 22 - BBC Chartering’s multipurpose vessel BBC Asia has delivered two mobile harbour cranes to the port of Brownsville in Texas.
Views: 155
First for Fred. Olsen thumbnail image

First for Fred. Olsen

January 22 - Fred. Olsen Windcarrier has completed the offshore works related to the decommissioning of two gas platforms for Perenco UK.
Views: 127

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.