Latest news from Heavy Lift & Project Forwarding International Magazine

Towering lift for Sarens in China

China Nuclear Engineering Group Corporation (CNEC) commissioned Sarens to perform a heavy lift operation at the SECCO chemical plant, China, one of the largest chemical plants in Shanghai that is currently undergoing modernisation.

On a site with operational constraints and surrounded by other chemical plants, the CC8800-1 crane, which has a lift capacity of 1,600 tonnes, has been used to remove and replace an old tower and install a new one.  

 
The first lift removed the upper section of old column which weighed 270 tonnes and the subsequent lift removed the bottom section. Then the crane was used to install the new tower measuring 68 m in height and weighing 400 tonnes.  

 
According to Xiaofei Zhang, who was responsible for the project: “The adjustable superlift radius and excellent lifting capacity of CC8800-1 [crane] has made the project smooth and swift.”  

 

The CC8800-1 is one of the largest cranes in the Sarens fleet, introduced by Sarens-Sinotrans JV (SSJV) to the Chinese market in September 2018. It took eight days to assemble, using one 220 tonne truck crane and one 400 tonne crawler crane.  

 

Sarens and Sinotrans Heavy-lift Logistics Company entered a joint-venture partnership in June 2015 to offer Chinese customers heavy lifting and engineered transport services. 

 

www.sarens.com 

Heavy Lift | News

Decarbonising shipping comes at a USD1 tn cost thumbnail image

Decarbonising shipping comes at a USD1 tn cost

January 22 - At least USD1 trillion of capital investment in land-based and ship-related infrastructure is required to reach the 2050 goal of reducing shipping’s greenhouse gas emissions by 50 percent of 2008 levels.
Views: 76
Cranes arrive in Brownsville thumbnail image

Cranes arrive in Brownsville

January 22 - BBC Chartering’s multipurpose vessel BBC Asia has delivered two mobile harbour cranes to the port of Brownsville in Texas.
Views: 160
First for Fred. Olsen thumbnail image

First for Fred. Olsen

January 22 - Fred. Olsen Windcarrier has completed the offshore works related to the decommissioning of two gas platforms for Perenco UK.
Views: 129

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.