Projects – Page 124
-
News
Dan-Czech handles gearbox shipment
Dan-Czech Specialtransport has transported two 55-tonne gearboxes from Pilsen in the Czech Republic to Zeebrugge, Belgium.
-
News
DS Lausnir lifts with Modulift
Icelandic crane rental company DS Lausnir lifted a 45-tonne boat in Hafnarfjörður using Modulift spreader beams.
-
News
Mammoet moves for Bridgewater
Mammoet has transported a 3,152-ton (3,150.9-tonne) heat recovery steam generator (HRSG) module from Coeymans, New York to PSEG Power Connecticut’s Bridgeport Harbor Station 5 project site.
-
News
Panalpina handles Cabinda cargoes
Panalpina has coordinated the transport of specialised pipes for the oil and gas industry from Malabo in Equatorial Guinea to Cabinda, Angola.
-
News
Hallett handles Heathrow cargoes
Hallett Silbermann has delivered two Liebherr HS 8130 HD crawler cranes, each weighing 85 tonnes, to London Heathrow Airport as part of the airport's integrated baggage system construction project.
-
News
Conceptum handles autoclave shipment
Conceptum Logistics has transported an autoclave from Germany to China.
-
News
Pasquinelli Ennio steps on the gas
Pasquinelli Ennio has handled the movement of a 195-ton (176.9-tonne) gas drum from the shipper’s facility to the port of Marghera in Italy.
-
News
Wind shipments keep rolling
Roll-Lift USA has transported wind turbine blades, measuring 67 m in length, from ship-side to a storage facility at Industrial Terminals on the Houston ship canal.
-
News
Maersk handles wind shipment
Maersk Line has transported wind turbine blades, measuring 103 ft (31.4 m) in length, from Krishnapatnam, India to Tianjin, China.
-
News
Paderborn rings Hofmann for bell installation
Hofmann Kran-Vermeitung has installed two bells, weighing 1 tonne and 13.5 tonnes, at Paderborn Cathedral in Germany.
-
News
DHL boils over in Saudi Arabia
DHL Industrial Projects is handling the delivery of four 140-tonne boilers from Germany to Saudi Arabia.
-
News
Steil Kranarbeiten splits bridge success
Steil Kranarbeiten has utilised its Terex CC 3800-1 crawler crane to lift bridge parts in Eppelborn, Germany.
-
News
Holsten Brewery relocation under way
Gustav Seeland has completed the first phase of Holsten Brewery’s relocation from the Altona district of Hamburg to Hausbruch, another area of the city.
-
News
Berard: successful tugboat load-out
New Iberia, Louisiana-headquartered Berard Transportation recently moved a 548-ton (497-tonne) tugboat measuring 123 ft (37. 4 m) long, 36 ft (10.9 m) wide and 67 ft (20.4 m) high.
-
News
Transportes Muciño powers up in Mexico
Transportes Muciño used its Goldhofer Faktor 5 girder bridge, along with an ADDrive heavy-duty drive unit, to deliver 13 gas turbines in Mexico.
-
News
Innovation completes bucket installation
GeoSea’s offshore installation vessel Innovation has successfully completed the installation of 20 suction bucket jackets at the Borkum Riffgrund 2 wind farm, located offshore Germany.
-
News
XLP round-up
Members of the XLProjects (XLP) network have been keeping busy recently, with a variety of projects.
-
News
Höegh turns up heat with furnace delivery
Höegh Autoliners has delivered a shipment of furnace parts from Durban, South Africa to Singapore on behalf of Themba Dry Cargo.
-
News
WVFA project inaugurated
The port of Vancouver, USA, has inaugurated its USD251 million West Vancouver Freight Access (WVFA) rail project.
-
News
ALS delivers TBM
Abnormal Load Services (ALS) has coordinated the delivery of a 100-tonne tunnel boring machine (TBM) from London to Leicestershire, UK.