Latest news from Heavy Lift & Project Forwarding International Magazine

ALS moves TBM for Thames Tideway project

ALS has coordinated the transport of tunnel boring machine (TBM) sections in London, UK. 

The TBM, named Charlotte, had been lifted out of the shaft at King George's Park. ALS arranged for the sections to be moved over two days with a private escort to Dormay Street. 

The components included a stationary shell, which measured 2.7 m x 3.4 m x 3.4 m and weighed 45 tonnes; a 50-tonne forward shell, which measured 2.7 m x 3.4 m x 3.4 m; and a tail, which weighed 8 tonnes. 

The TBM will soon be used to tunnel a further 600 m as part of the Thames Tideway Tunnel project. 

abnormal-loads.com

Heavy Lift | News

Steel shipment for Alistair thumbnail image

Steel shipment for Alistair

April 2 - Alistair Group has transported steel structures from Durban, South Africa to Kolwezi in the Democratic Republic of the Congo.
Views: 292
GAC in bridge shipment thumbnail image

GAC in bridge shipment

April 1 - GAC Sweden has coordinated the delivery of a 143 m-long bridge that will connect Stockholm’s Gamla Stan island with Södermalm.
Views: 597
Liebherr installs Orion boom thumbnail image

Liebherr installs Orion boom

April 1 - Liebherr has installed the 145 m-long boom of the HLC 295000 – the largest crane ever built by the manufacturer – at the port of Rostock, Germany.
Views: 497

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.