2022-03-15T08:53:00
The second offshore transformer station topside for the Hollandse Kust Zuid (HKZ) grid connection has departed Drydocks World Dubai’s fabrication yard and is on its way to the Netherlands for installation.
Already have an account? LOG IN
Keep up to date on the latest information on over-dimensional and heavy cargoes.
Site powered by Webvision Cloud