Latest news from Heavy Lift & Project Forwarding International Magazine

Mammoet installs in shallow waters

Mammoet has installed four 7 MW wind turbines at the Nissum Bredning wind farm in Denmark.

Located in the Bay of Thyborøn, the Nissum Bredning wind farm cannot be accessed by specialist installation vessels due to the seabed conditions and shallow water depths of only 3 m. Therefore, Mammoet utilised a barge with an integrated ballasting system to transport and install the wind turbine components.

According to Mammoet, this provided the necessary stability for the operation while eliminating the need for dredging.

The components for the four wind turbines, which have a hub height of 97 m, were lifted and installed with a Liebherr LR11350 crane.

 

www.mammoet.com

Heavy Lift | News

Tschudi delivers for Belgian paper mill thumbnail image

Tschudi delivers for Belgian paper mill

August 22 - Tschudi Logistics has coordinated the delivery of five digesters and a liquor accumulator for Burgo Ardennes’ paper mill in Belgium.
Views: 211
ACS delivers in Japan thumbnail image

ACS delivers in Japan

August 20 - Air Charter Service (ACS) has coordinated the shipment of a 35-tonne flight simulator from Texas to Japan using a Boeing 747.
Views: 357

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.