Latest news from Heavy Lift & Project Forwarding International Magazine

Osprey crosses the M1

Osprey Heavy Lift has installed a 1,200-tonne bridge deck over the M1 motorway in the UK on behalf of Buckingham Group Contracting and Cleveland Bridge.

Measuring 17 m wide and 50 m long, the bridge forms part of the 700-acre (283 ha) Segro Logistics Park East Midlands Gateway.

After almost a year of planning, the Osprey team utilised SPMTs and various trailer configurations to install the bridge.

For the installation, Osprey fitted the trailers with support structures to reach the required height of the bridge. The bridge was designed with additional tail units, which allowed a secondary set of 24 axles to support the east end of the deck and land it on to the bearing plates, said Osprey.

According to Osprey, the deck was landed into the bearing plates six hours ahead of schedule.

In the weeks leading up to the launch of the bridge, alterations were made to the M1, including filling in the central reservation and removing street furniture to enable a clear path for the bridge to be driven over the motorway by the SPMTs.


 

www.ospreyltd.com

Heavy Lift | News

MIS moves engine across Oman thumbnail image

MIS moves engine across Oman

September 13 - Muscat International Shipping & Logistics (MIS) has transported a 140-ton (127-tonne) Wärtsilä engine from a power station in Khasab to Duqm, Oman.
Views: 459
CTO completes brewery shipment thumbnail image

CTO completes brewery shipment

September 12 - CTO do Brasil has coordinated the delivery of brewery equipment from the port of Nantong, China to the port of Santos, Brazil.
Views: 378
Van der Vlist in blade delivery thumbnail image

Van der Vlist in blade delivery

September 12 - Van der Vlist is in the process of delivering 50 wind turbines to the Wieringermeer project in the Netherlands.
Views: 436

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.