Latest news from Heavy Lift & Project Forwarding International Magazine

Schryver handles heat exchangers

Schryver Del Ecuador has handled a shipment of eight heat exchangers for a petroleum plant expansion project in the Ecuadorian jungle.

The exchangers ranged in weight from 45 tons (40.8 tonnes) to 65 tons (60 tonnes). Two of the units were shipped from the port of Buenaventura in Colombia to Guayaquil in Ecuador, and then transported to the project site in Quito.

The remaining six units were transported by road from the factory in Cali, Colombia directly to the project site.

www.schryver.com

Heavy Lift | News

Megalift moves for MRT project thumbnail image

Megalift moves for MRT project

April 3 - Megalift has moved a 60-tonne locomotive and a 17-tonne wagon for the Mass Rapid Transit (MRT) railway project in Malaysia.
Views: 580
Steel shipment for Alistair thumbnail image

Steel shipment for Alistair

April 2 - Alistair Group has transported steel structures from Durban, South Africa to Kolwezi in the Democratic Republic of the Congo.
Views: 634

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.