Latest news from Heavy Lift & Project Forwarding International Magazine

ALE wraps up Ichthys work

October 25 - ALE has completed its scope of work at the Ichthys project's onshore LNG facilities in Darwin, Australia.

Beginning in 2014, ALE was contracted by JKC Australia to load-out 178 pre-fabricated modules - weighing a total of 41,612 tonnes - for the project utilising the Hydro Deck pontoon, which is owned and operated by AG&P ALE Ventures.

The pontoon was used to keep level with the module offloading facility at the site, in order to safely load-out the modules.

The heaviest module weighed in at 1,821 tonnes and was moved using 150 axle lines of self-propelled modular transporters (SPMT); while the longest unit, which measured 73 m, was moved on 92 axles lines of SPMTs.

ALE claims that the Hydro Deck pontoon allowed the company to widen otherwise tide-constrained module delivery windows for the Ichthys project, and provide cost-effective and timely shipments.

 

 

www.ale-heavylift.com

Heavy Lift | News

Cory moves to Ipswich office thumbnail image

Cory moves to Ipswich office

October 18 - UK-headquartered Cory Brothers has relocated its office in Felixstowe to Ipswich town centre.
Views: 283
ALE executes pit move thumbnail image

ALE executes pit move

October 18 - ALE has lifted and transported a sulphur storage facility for the Lindsey Oil Refinery in the UK.
Views: 227
Bichowski joins AMT thumbnail image

Bichowski joins AMT

October 18 - Switzerland-headquartered logistics and supply chain specialist AMT has appointed Frank Bichowski as its chief commercial and operations officer.
Views: 290

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.