Latest news from Heavy Lift & Project Forwarding International Magazine

ALE wraps up Ichthys work

October 25 - ALE has completed its scope of work at the Ichthys project's onshore LNG facilities in Darwin, Australia.

Beginning in 2014, ALE was contracted by JKC Australia to load-out 178 pre-fabricated modules - weighing a total of 41,612 tonnes - for the project utilising the Hydro Deck pontoon, which is owned and operated by AG&P ALE Ventures.

The pontoon was used to keep level with the module offloading facility at the site, in order to safely load-out the modules.

The heaviest module weighed in at 1,821 tonnes and was moved using 150 axle lines of self-propelled modular transporters (SPMT); while the longest unit, which measured 73 m, was moved on 92 axles lines of SPMTs.

ALE claims that the Hydro Deck pontoon allowed the company to widen otherwise tide-constrained module delivery windows for the Ichthys project, and provide cost-effective and timely shipments.

 

 

www.ale-heavylift.com

Heavy Lift | News

AF Marine launched thumbnail image

AF Marine launched

February 26 - Deepsea towage operators Augustea Group and transport engineering specialist Fagioli have established a 50-50 joint venture, AF Marine.
Views: 515
Blue Water Shipping opens in Trinidad thumbnail image

Blue Water Shipping opens in Trinidad

February 26 - Blue Water Shipping will open an office in Trinidad & Tobago to service the growing oil and gas sector in the Caribbean and the north-eastern region of South America.
Views: 552
LOC lands LNG Canada deal thumbnail image

LOC lands LNG Canada deal

February 26 - LOC Group has signed a multi-year contract with LNG Canada to provide marine warranty surveyor (MWS) services and vessel quality assurance at the project in Kitimat.
Views: 534

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.