Latest news from Heavy Lift & Project Forwarding International Magazine

Bilbao ups ro-ro capacity

September 27 - The Port of Bilbao in the Basque Country of northern Spain has started construction of an additional ro-ro ramp.

It will be the eighth ramp at the port and will feature a minimum load capacity of 250 tonnes. 

According to Uniport Bilbao, the equipment will reinforce the services that the shipping companies and logistics operators of the port community offer to the manufacturing industry.

The ro-ro ramp will completed by the beginning of next year.

Meanwhile, since July 2017, port companies Amarradores Puerto de Bilbao, Corporación de Prácticos del Puerto y Ría de Bilbao, and Compañía de Remolcadores Ibaizabal have been preparing a pontoon for the loading, transport and stowage of components for the Rentel wind farm substation in Belgium.

The pontoon was commissioned by the French shipyard STX, while the structures were manufactured by Navacel in Axpe.

The first structure, a transition piece weighing 730 tons (662 tonnes) and measuring 30 m in height and 7 m in diameter at the base, was loaded onboard BOA Offshore's heavy lift barge CC Biscay by the shipping agent Toro & Betoloza for onward shipment to the Port of Rotterdam.

The cargo departed the Port of Bilbao at the end of August.

 

www.uniportbilbao.es

www.bilbaoport.eus

www.boa.no

Heavy Lift | News

CLA adopts CHAMP solution thumbnail image

CLA adopts CHAMP solution

May 29 - CargoLogicAir (CLA) has implemented CHAMP’s weight and balance solution for advanced load planning.
Views: 70
Flinders prepares for Konecranes delivery thumbnail image

Flinders prepares for Konecranes delivery

May 29 - Flinders Port Holdings will take delivery of a Konecranes Gottwald Model 6 mobile harbour crane at its facilities in Port Adelaide, Australia during August.
Views: 99
BigRoll Beaufort moves for Virginia wind farm thumbnail image

BigRoll Beaufort moves for Virginia wind farm

May 29 - Roll Group has transported wind energy components using its vessel BigRoll Beaufort to assist in the construction of a wind farm 27 miles (43 km) off the coast of Virginia, USA.
Views: 180
Urgent action needed on keyworker designation thumbnail image

Urgent action needed on keyworker designation

May 29 - The heads of the maritime, labour and aviation organisations of the United Nations have issued a plea for urgent action on crew changes and for keyworker designation.
Views: 152

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.