Latest news from Heavy Lift & Project Forwarding International Magazine

Gdynia prepares for offshore wind projects

The port of Gdynia, the district of Kosakowo and the cities of Rumia and Gdynia have signed a letter of intent (LoI) to develop and operate landside infrastructure to support offshore wind energy projects.


According to the port, Poland’s national power system currently has a total capacity of approximately 41 GW – 70 percent of which is based on coal-fired power plants.

The oldest power units will soon be withdrawn from use. “The solution to this problem is renewable energy, which will fill this gap and at the same time will be up to date with EU and global trends,” said the Port of Gdynia Authority.

The port authority added that “the Baltic Sea [will] have a chance to play a key role in the energy transformation of Poland towards a low-emission economy.”

Adam Meller, president of the managing board at the Port of Gdynia Authority, said: “In regard to our infrastructure potential and navigational capabilities, we have carried out analyses of the possibilities of adapting the land for the handling, storage and assembly of offshore wind farm components. The results indicate that we are ready to service offshore wind farms, both during the construction and operation phases.”

Reports suggest that construction of Poland’s first offshore wind farm could start in 2022.

www.port.gdynia.pl

Heavy Lift | News

Fire outbreak at US port thumbnail image

Fire outbreak at US port

June 5 - A fire broke out aboard Höegh Autoliners’ ro-ro vessel Höegh Xiamen yesterday (June 4) at Blount Island, Jacksonville, USA; there are no injuries to any of the 21 crew members, who have all been evacuated from the vessel.
Views: 410
Intradco charters AN-225 thumbnail image

Intradco charters AN-225

June 5 - Intradco Global, in collaboration with GTA GSM, charted the Antonov AN-225 freighter aircraft to transport nearly 1,000 cu m of medical supplies and personal protective equipment (PPE).
Views: 388
Pacific Osprey returns to service  thumbnail image

Pacific Osprey returns to service 

June 5 - Swire Blue Ocean’s (SBO) wind farm installation vessel Pacific Osprey has returned to service following the installation of its extended crane boom in Denmark. 
Views: 470

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.