Latest news from Heavy Lift & Project Forwarding International Magazine

Mohembo bridge parts move in Namibia

10,720 tonnes of project cargo, destined for the Mohembo bridge project in Botswana, has moved through the port of Walvis Bay in Namibia.

The cargoes arrived at the port on the vessel Nomadic Milde. The components will be used to complete the construction of 1.2 km-long bridge that will connect villages on the east of the Okavango River with the rest of the country.

It is expected to take 160 truckloads to transport the cargo to the construction site in Botswana.

www.namport.com.na

Heavy Lift | News

Fitzgerald returns to Crowley  thumbnail image

Fitzgerald returns to Crowley 

February 21 - Crowley Maritime Corporation has appointed Ray Fitzgerald as its chief operating officer, effective March 1. 
Views: 386
KENC completes engineering scope for Jumbo thumbnail image

KENC completes engineering scope for Jumbo

February 21 - The Netherlands-based KENC Engineering has collaborated with Jumbo to prepare the heavy lift vessel Fairplayer for an FPSO installation project offshore Brazil. 
Views: 330

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.