Latest news from Heavy Lift & Project Forwarding International Magazine

Barrus moves blade sets to Adygea

Barrus Group has coordinated the delivery of 180 wind turbine blades from India to the Adygea wind farm, under development by NovaWind.

The wind turbine blades, which weighed 10.4 tonnes and measured 49.2 m x 3.66 m x 2.88 m, were transported from the manufacturing facility in Bangalore to the construction site in southern Russia.

www.barrusprojects.com

 

 

Heavy Lift | News

UAL vessels gather in Antwerp thumbnail image

UAL vessels gather in Antwerp

August 23 - Three Universal Africa Lines (UAL) ships have been spotted at the port of Antwerp. All three are being loaded with cargoes destined for West Africa.
Views: 456
Roll Group opens in Asia thumbnail image

Roll Group opens in Asia

August 23 - Roll Group has strengthened its presence in the Asia Pacific (APAC) market by opening offices in Singapore, Malaysia, Indonesia, Thailand and South Korea.
Views: 490
Höegh rolls to Mombasa thumbnail image

Höegh rolls to Mombasa

August 23 - Höegh Autoliners has shipped 100 breakbulk units destined for a cement plant in Kenya on using two of its ro-ro services.
Views: 408
ALE-Giant executes Formosa works thumbnail image

ALE-Giant executes Formosa works

August 23 - ALE has established a joint venture with Giant Taiwan to handle the movement, transport and storage of wind turbine foundations for the Formosa 1 Phase 2 wind farm.
Views: 341

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.