Latest news from Heavy Lift & Project Forwarding International Magazine

Overcoming low water levels with Dan-Czech

Dan-Czech Specialtransport has handled the delivery of a 110-tonne turbine from the Siemens factory in Görlitz, Germany to Avonmouth, UK.

As a result of low water levels on the river Elbe, the turbine had to be transported via Nuremberg. According to Dan-Czech, the turbines would usually be transported via Dresden or Aken.

From Nuremberg the turbine was transported to Rotterdam by barge, where it was loaded onto a vessel for onward transportation to Avonmouth.

For the road transport from the factory to the loading dock in Nuremberg, the combination measured 26.5 m x 4.7 m x 5.25 m and weighed 163.4 tonnes, excluding the push truck.

In total, it took three weeks to transport the equipment from Görlitz to its final destination.

dan-czech.cz

Heavy Lift | News

Kässbohrer on display at bauma thumbnail image

Kässbohrer on display at bauma

March 22 - Kässbohrer is showcasing its range of lowbed trailers at the bauma 2019 exhibition, which takes place between April 8-14 in Munich.
Views: 134
Elbe Project Cargo Line launched thumbnail image

Elbe Project Cargo Line launched

March 22 - Sächsische Binnenhäfen Oberelbe, in cooperation with Deutsche Binnenreederei, launched the Elbe Project Cargo Line (EPCL) – a liner service for oversize and heavy project cargoes.
Views: 269
Mammoet moves for Mitsubishi thumbnail image

Mammoet moves for Mitsubishi

March 22 - Mammoet has delivered and installed 120 pressure vessels and modules for the construction of the Caribbean Gas Chemical Limited (CGCL) methanol and dimethyl ether (DME) plant in La Brea, Trinidad and Tobago.
Views: 247

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.