Latest news from Heavy Lift & Project Forwarding International Magazine

Blades travel through Emden

EPAS Ems Ports Agency & Stevedoring has handled the offloading of 24 wind turbine blades at the Seaports of Niedersachsen's north quay in Emden, on behalf of turbine manufacturer Enercon.

 The cargo arrived at the port from Brazil onboard the multipurpose vessel Orange River. According to the Seaports of Niedersachsen, with a draft of 10.9 m and a length of 189.9 m, it is one of the largest vessels allowed to sail into the inland port of Emden.

Each blade measured 44 m in length and is destined for the onshore wind farm at Nordkai.

 

www.seaports.de

www.epas-emden.de

Heavy Lift | News

ALE-Giant executes Formosa works thumbnail image

ALE-Giant executes Formosa works

August 23 - ALE has established a joint venture with Giant Taiwan to handle the movement, transport and storage of wind turbine foundations for the Formosa 1 Phase 2 wind farm.
Views: 233
Paderewski completes maiden call in Emden thumbnail image

Paderewski completes maiden call in Emden

August 23 - Chipolbrok’s multipurpose vessel Paderewski made its maiden call at the German port of Emden to load wind energy equipment destined for Masan, South Korea.
Views: 233
Esbjerg welcomes LHM 800 thumbnail image

Esbjerg welcomes LHM 800

August 23 - Denmark’s Port Esbjerg has taken delivery of a 308-tonne lifting capacity LHM 800 mobile harbour crane from Liebherr.
Views: 232

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.