Latest news from Heavy Lift & Project Forwarding International Magazine

Blyth completes decommissioning

The UK’s port of Blyth has completed its largest offshore energy decommissioning project.

Maersk Decom and Maersk Supply Service have been managing the removal and recycling of subsea infrastructure from Perenco’s Thames field in the UK North Sea. A number of wellheads and wellhead protection structures have been delivered to the port of Blyth.

The recovered structures were dismantled at the port’s Battleship Wharf terminal.

The port has also played host to several smaller decommissioning projects recently, including the removal of two 2-MW turbines owned by E.on. The units, which formed the UK’s first offshore wind farm, had reached the end of their technical lifespan and were decommissioned.

www.portofblyth.co.uk

www.maerskdecom.com/

Heavy Lift | News

Intradco charters AN-225 thumbnail image

Intradco charters AN-225

June 5 - Intradco Global, in collaboration with GTA GSM, charted the Antonov AN-225 freighter aircraft to transport nearly 1,000 cu m of medical supplies and personal protective equipment (PPE).
Views: 193
Mammoet launches Austal ferry thumbnail image

Mammoet launches Austal ferry

June 4 - Mammoet has coordinated the load out and float off of Austal Philippines’ 109 m-long, 1,700-tonne catamaran ferry FSTR.
Views: 485

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.