Latest news from Heavy Lift & Project Forwarding International Magazine

MIS moves engine across Oman

Muscat International Shipping & Logistics (MIS) has transported a 140-ton (127-tonne) Wärtsilä engine from a power station in Khasab to Duqm, Oman.

The engine and its accessories were loaded onto multi-axle trailers at the site of the old power station for transportation to the port of Khasab.

The cargoes were then shipped to the port of Shinas, where MIS was responsible for the offloading operations and delivery to the Duqm power station, a distance of approximately 800 km.

MIS, part of the Project Cargo Network (PCN), said all operations were completed within 17 days.

www.mismuscat.com

www.projectcargonetwork.com

Heavy Lift | News

Mammoet moves Sky Bridge thumbnail image

Mammoet moves Sky Bridge

February 18 - Mammoet has transported and installed a 200 m-long bridge at Hong Kong International Airport (HKIA).
Views: 377
Bolloré handles Heibloem blades thumbnail image

Bolloré handles Heibloem blades

February 18 - Bolloré Logistics Belgium has handled six wind turbine blades for an onshore wind farm in Heibloem, the Netherlands.
Views: 344

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.