Latest news from Heavy Lift & Project Forwarding International Magazine

Berard doubles up

May 2 - Berard has transported a 67-tonne boiler from Mississippi to Nevada, USA utilising a 12-axle Trail King specialised trailer and a Peterbilt tractor.

The cargo, which measured 36 ft x 17 ft x 16 ft (10.9 m x 5.2 m x 4.9 m), was loaded onto the trailer and transported 2,775 miles (4,466 km).

In a separate project, Berard moved a 260-ton (235.8- tonne) Breaux Brothers support vessel, the Fast Lion, from the fabrication yard into the Bayou Teche river in Louisiana, USA.

The vessel, which measured 205 ft (62.5 m) in length and 33 ft (10 m) in width, was transported using a Peterbilt prime mover, a 75-ton (68-tonne) steering dolly, an eight-axle custom rear dolly and three winch trucks.

 

www.berardtrans.com

 

Heavy Lift | News

Laso begins Alecrim-Urze wind farm project thumbnail image

Laso begins Alecrim-Urze wind farm project

February 20 - Laso Transportes has been tasked with the transport of several wind energy components for the Alecrim-Urze wind farm in Paúl da Serra, on the island of Madeira.
Views: 280

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.