Latest news from Heavy Lift & Project Forwarding International Magazine

Sarens debuts new jacking system

January 12 - Sarens has used its new CS1000 jacking system for the first time to install a 2,000-tonne, 120 m long segment of the new Schierstein Bridge in Germany.

Sarens had previously transported and installed the first 2,000-tonne bridge segment on the Wiesbaden side of the bridge.

Sarens performed the transport and lifting of another 2,000-tonne preassembled bridge segment, this time using the new CS1000 jacking system.

According to Sarens, the CS1000 system was designed to handle very high horizontal loads while addressing operational constraints.

The Schierstein Bridge had to be replaced due to extensive corrosion as well as a daily load of 80,000 vehicles per day, exceeding the original design limit of 23,000.

A new bridge is being built alongside the old bridge in phases, with completion expected in 2020.

 

www.sarens.com

Heavy Lift | News

Fitzgerald returns to Crowley  thumbnail image

Fitzgerald returns to Crowley 

February 21 - Crowley Maritime Corporation has appointed Ray Fitzgerald as its chief operating officer, effective March 1. 
Views: 398
KENC completes engineering scope for Jumbo thumbnail image

KENC completes engineering scope for Jumbo

February 21 - The Netherlands-based KENC Engineering has collaborated with Jumbo to prepare the heavy lift vessel Fairplayer for an FPSO installation project offshore Brazil. 
Views: 336

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.